Procurement of timber We buy the sawn timber used from fifteen different domestic sawmills. Our sawn timber use on annual basis is 35 000 m3, meaning that a fluent co-operation with reliable subcontractors is very important for us.
Process:
1. Sawing 2. Drying 3. Sorting 4. Packing and transportation to the truss factory 5. Planing 6. Strength sorting 7. Sawing of parts 8. Assembly of parts into a truss
|